Liverpool Docks
This scheme comprises four wind turbines positioned just behind the sea wall adjacent to the River Mersey.
This scheme comprises four wind turbines positioned just behind the sea wall adjacent to the River Mersey.
Our provision of specialist technical advice was a key part of the installation of a new turbine generator for the black start power station at Barford in Cambridgeshire.
At Craigengelt we provided full design services for the access track to allow delivery of components for 8 wind turbines to the site.
This development comprises a 2-storey office block along with 3 blocks of Workshop units incorporating associated car parking and external works.
We were involved in this award winning development throughout the pre-planning and concept stages through to project completion.
Let to a major construction contractor as a regional centre, the architectural concept was for a 3-sided box with a roof jutting out between the box ends and a glazed facade to the front elevation.